Bernborough Ascot - Construction Progress


Building on the remarkable success of the first two sold-out stages, Bernborough Ascot is entering an exciting new chapter with Magnolia House, currently under construction. 

Set within one of Brisbane's most prestigious locations beside Doomben Racecourse, residents already enjoy access to an exceptional collection of lifestyle, wellness and social amenities, enhanced by Serenity Corner, a welcoming on-site café and restaurant that welcomes both residents and the local community. 

The highly anticipated Magnolia House will feature 69 beautifully appointed two and three-bedroom residences, an exclusive Penthouse Collection, and a spectacular rooftop dining and entertaining space with sweeping views across Doomben Racecourse. Selected residences will also capture stunning Brisbane city views, creating a truly exceptional living experience. 

As construction continues to take shape, Magnolia House brings to life a refined vision for retirement living, thoughtfully designed for those seeking sophisticated design, premium amenities and the freedom to enjoy life in full bloom.


Register your interest today to receive exclusive Magnolia House updates and release information.


Register your interest  
Bernborough Ascot masterplan aerial


LATEST UPDATES


Progress: Exciting progress continues at Magnolia House

Construction Update October 2026

October 2026 – Windows are now being installed across the lower levels, internal walls are taking shape, and the first glimpses of these beautifully designed residences are beginning to emerge. 

Construction is also advancing steadily upward, with Level 5 nearing completion and the building continuing to rise floor by floor.

With just three levels remaining before reaching its full height, Magnolia House is becoming an increasingly prominent feature of the Bernborough Ascot skyline.


Construction Update October 2026
Construction Update August 2026

Progress: Magnolia House reaches new heights

Construction Update August 2026

August 2026 – Construction has reached several key milestones, including the installation of the tower crane, construction hoist and concrete placing boom, helping to drive efficiency across the site.

The first concrete pour to Level 4 has been completed, while services rough-in is now underway on the lower floors. Window installation is also set to commence in the coming months, marking an important milestone as the building begins to take shape from the inside out.

With construction progressing as planned, Magnolia House remains on track for completion in late 2027.

Progress: Magnolia House is taking shape

Construction Update April 2026

April 2026 - Construction is progressing well at Magnolia House, with several key milestones already achieved as this exciting new addition to Bernborough Ascot continues to rise. 

The basement has been completed, while suspended ground slabs and columns have been poured, creating a solid foundation for the levels above. Scaffolding now surrounds the structure, supporting safe and efficient site operations, with a construction hoist to be installed to further enhance productivity. Significant concrete pours are driving steady vertical progress, with each stage bringing the building closer to life. 

As Magnolia House rises, fit-out works will begin on the lower levels, including the installation of services, ceilings and internal partitions. 

Construction Update April 2026
Award winner Zainabu Abdulganiu

Magnolia House construction begins with a winning crane name

Award winner Zainabu Abdulganiu

October 2025 - Macgregor State High School student Zainabu Abdulganiu has left her mark on Bernborough Ascot, winning the competition to name the crane arriving soon on site. Her winning entry, Eternal Stable, will take pride of place as construction begins on the community’s third building, Magnolia House.

The competition, run through the Property Council of Australia’s Girls in Property initiative, introduces female students to careers in property and construction. Builder Balmain & Co is now underway, with the crane installation scheduled for November. Magnolia House will feature two- and three-bedroom apartments, three penthouses, and a rooftop dining space with sweeping racetrack views.

Poinciana House celebrates completion

Construction Update January 2025

March 2025 - A momentous milestone in the second stage of Bernborough Ascot has come to fruition with the completion of Poinciana House. This luxurious new residence, featuring 53 new luxury apartments,  is now also home to Serenity Corner Café, open for breakfast and lunch, offering stunning outdoor views of the expansive new bowling green.

The new leisure facilities and Wellness Centre are now in full swing, with residents enjoying exclusive access to an indoor heated magnesium pool, a fully equipped gym, and an infrared sauna. Additionally, the newly opened Pavilion dining room and the sophisticated Ascot Lounge provide elegant spaces for social gatherings and relaxation.


Construction Update January 2025
Construction Update January 2025

Progress: Poinciana just months from move-in

Construction Update January 2025

January 2025 – The new year is off to a flying start at Poinciana House, now just a few months away from welcoming its first residents. Trades have been busy across all floors, with services coming online and final touches and checks underway. 

On the ground floor, finishing trades are progressing with tiles, floor coverings, joinery and painting. Up on levels one to six it’s checking for any trade defects and making rectifications to ensure each home is ready for move-in day. 

Outside the focus has been on hardscaping and deck construction around our beautiful old fig tree. Excitingly, the scaffolding has all now been removed and the overall façade is 80% complete!

Progress: Apartments emerging at Poinciana

Construction Update October 2024

October 2024 - What an exciting last few months at Poinciana House! Our apartments across all floors are really starting to look the part with their first coats of paint on the walls. Kitchen cabinetry and benchtops have been installed across levels one to four, and cabinetry for levels five and six is being finalised. The ground floor has also received its first coat of paint and has cabinetry in progress. 

Outside we’ve been busy constructing the bowling green and landscaping is underway. The crane has been dismantled and the internal lifts are operational! With scaffolding starting to come down, beginning with the upper levels, the building façade is slowly becoming visible and we can’t wait to see the remainder emerge over the next few months. 

Construction Update October 2024
Construction Update July 2024

Progress: Poinciana House shaping up

Construction Update July 2024

July 2024 – It’s been all systems go at Poinciana House with our new builders, Balmain & Co, making steady progress since they took over the site. On the lower levels we’ve been busy sheeting and sanding to ensure smooth and finished surfaces throughout. All the necessary services have been installed on the ground floor, and levels two to four have windows! 

Levels five and six are also really starting to take shape, with framing and rough-in works completed and window installation about to start. Up on the roof we’re ready for the installation of plant equipment and waterproofing measures. 

We’re now really working our way towards the building being watertight, with all glazing and roof works set for completion in September.  


Action back underway at Poinciana House

Construction Update April 2024

April 2024 - It has been so good to see activity at Poinciana House over the last month. We’re pleased to now have a new builder on site undertaking early works and coordinating all subcontractors. Our previous site managers are also continuing on the project to help ensure a smooth transition. 

Keyton recently took formal control of the site following St Hilliers, the builder overseeing construction, going into voluntary administration in February. We’re so excited to continue work on Poinciana House and look forward to construction being back in full swing very soon!

Construction Update April 2024
Construction Update January 2024

Progress: Poinciana House tops out

Construction Update January 2024

January 2024 – The construction of Poinciana House reached an important milestone this month, officially topping out when the roof slab was poured in late-January. We’ve also poured the roof of the external stairs and amenities. With the concrete of all floors now at full strength, next will be progressively removing the back propping that has been temporarily supporting the building up to now. 

Partition framing for levels one and two is complete and we’ve begun services/linings and window subframe installation on these levels. Partitions and services works next move up to levels three and four. 


Progress: Poinciana House, Level 4 of 7 complete

Construction Update November 2023

November 2023 - Poinciana House has gone from strength to strength in the last few weeks, quite literally! After 97,000 project hours, the structure for four of the seven levels is now complete. Steelwork on the ground floor and level one is firmly in place and work has begun on level two, adding further strength and structure to the new building.  

Finishes works have also been ongoing, with construction of the partitions for the ground floor, levels one and two in progress. Installation of electrical, mechanical and hydraulic services are also underway. Next up for the team is completing the structures of levels five and six, and finalising the roof structure.   

Construction Update November 2023
Construction Update October 2023

Progress: Poinciana House reaches halfway vertical height

Construction Update October 2023

October 2023 - Poinciana House is well and truly taking shape, reaching the halfway point of its vertical height! With the slab pours for levels one to three now complete, level four has commenced with its first pours occurring in late October. 

The team has started construction of the partitions (steel framed walls) to both the basement and ground floor. Installation of electrical, mechanical and hydraulic services are also underway. The Practical Completion Date of mid/late 2024 is well on track. 


Progress: Civil works at Poinciana House now complete

Bernborough Ascot stage 2 civil works complete

July 2023 - We are excited to announce that civil works at Poinciana House have been completed! 

With focus now shifting to building the structure, a tower crane was installed last month and concrete pours to the basement and ground floor slabs are well and truly underway. To date, 2,500m3 of concrete has been poured and 30,000 hours have been worked on the project. 

Bernborough Ascot stage 2 civil works complete
Bernborough Ascot commencement stage 2 Poinciana House sod turn

Construction of Poinciana House underway

Bernborough Ascot commencement stage 2 Poinciana House sod turn

February 2023 - This month we celebrated the start of construction of our second building at Bernborough Ascot, Poinciana House. 

Designed by Cottee Parker, the seven-storey tower will feature 53 luxury one, two and three-bedroom apartments. It will also provide residents with a range of amenities including a restaurant, lounge, health and wellness centre, rooftop terrace and outdoor bowling green. Congratulations to the team and all involved!

Find Out More | Bernborough Ascot

Discover the vibrant lifestyle at Bernborough Ascot, the convenient and stunning location, spacious apartments, resort style amenities, wellbeing program and so much more.